City Creek at Folsom Trail
Revitalizing a rail corridor into a thriving ecosystem & community connection.
The Folsom rail line was abandoned in 2008, the tracks removed, and the corridor left neglected [01]. The Utah Power & Light/Utah Barrel Company Superfund site and contamination from industrial land-use continue to pollute the land, water, and health of the neighborhood [02]. The I-80 overpass and renewed use of the railroad separate east-west connectivity and cultural exchange. This limits mobility, decreases access to jobs, creates dangerous encounters between people, cars, and trains, and silos communities.
Running from the North Temple FrontRunner commuter rail station to the Jordan River Trail, the Folsom Trail creates a safe, comfortable connection for access, recreation, celebration, learning, and enjoyment. The restored City Creek will improve water quality, access to nature, and flooding. Integrated art and green space will activate the corridor. Balancing preservation and new holistic, mixed-use development will protect the character of the neighborhood, while diversifying housing, jobs, and entertainment. Click here to review the City Creek at Folsom Trail Daylighting Design Plan.
“Simply having access to water and wetlands would encourage more wildlife and have great psychological benefits. It would help connect, in a very visible way, our mountains and rivers, which I think would be a huge catalyst for further environmental protection and restoration.”
Goals
Create a multi-use, multi-generational, and low-stress link and gateway between regional destinations, cultural amenities, and transportation corridors;
Restore the historic City Creek corridor into a thriving green space and living laboratory to maximize ecosystem services and community connection to nature;
Retain and commemorate the unique identity of the corridor through the preservation of historic structures and placemaking;
Create a beautiful neighborhood center to support local businesses, improve employment base, and ensure all residents have access to goods, services, and entertainment; and
Celebrate the cultural diversity that reflect community values and maintain neighborhood stability to foster community pride.
Background
Since 1965’s Second Century Plan, City Creek was highlighted for daylighting through downtown Salt Lake City [03]. The 1992 Salt Lake City Open Space Plan highlighted a route that would flow from Memory Grove, through the downtown core, into what would become The Gateway, and finally through a rail corridor on its way to the Jordan River [04]. This rail corridor, the Folsom line, would gather momentum in the early 2000s for transformation into a future trail and creek corridor [05].
During the Gateway District redevelopment, the daylighting of City Creek became a major focus of the vision. The Folsom rail line was realigned and, in 2011, an overflow culvert was placed down the corridor to mitigate flooding [06]. However, the trail and daylighting project never took off. Momentum waned until the project was re-energized by the Seven Canyons Trust in 2016.
Data
Did you know City Creek flows under North Temple? [07]
Do you support daylighting here?
Updates
The Seven Canyons Trust and Salt Lake City Redevelopment Agency have completed the City Creek at Folsom Trail Daylighting Design Plan, the culmination of a two-year process to envision City Creek and additional improvements along the Folsom Trail between 700 and 1000 West in Salt Lake City. Now, we are tasked with building momentum and raising funds to implement the vision!
A community-based vision to uncover City Creek channel and add additional improvements along the Folsom Trail between approximately 700 West and 1000 West in the Poplar Grove neighborhood of Salt Lake City.
The Roots Art Kollective has completed the nearly 300’ Folsom Trail Mural Project. Their mural acknowledges City Creek, beautifies the Folsom Trail corridor, and represents the Euclid/Poplar Grove neighborhood.
Listen to audio of the City Creek at Folsom Trail design walks on Ways of Water from KRCL Radioactive’s Connor Este.
The design for City Creek at Folsom Trail is here. Tell us what you think about the concept at: folsomtrail.org/design. Your feedback is key to the future City Creek at Folsom Trail!
EPA grant will allow Salt Lake City to clean up west-side site and possibly bring restaurants, coffeehouses and other commerce to the Folsom Trail.
The Roots Art Kollective has been selected for the Folsom Trail Mural Project. Their mural will acknowledge City Creek, beautify the Folsom Trail corridor, and represent the Euclid/Poplar Grove neighborhood.
A wall in want of character. The Folsom River Mural Project is an opportunity for local artists to make their mark.
We are seeking an artist or artist-led team to create an outdoor mural along the Folsom Trail at 25 S 1000 W, Salt Lake City, UT 84104. The artwork is intend to acknowledge City Creek, beautify the Folsom Trail corridor, and represent the Euclid/Poplar Grove neighborhood.
An article covering progress on the City Creek at Folsom Trail Daylighting Design Plan. Community engagement efforts and existing environmental conditions have informed initial characterizations and conceptual designs.
This articles highlights seven excellent rail-trail case studies in 2022, including the Folsom Trail in Salt Lake City, UT. Join us in celebrating these transformative public trails!
A “quick-action” project funded by the 2017 AARP Community Challenge spurred improvements that enable residents of Salt Lake City, Utah, to get around without having to always get into a car.
The Salt Lake City Parks, Trails, and Open Space Bond was approved by Salt Lake City voters this November. The $85-million bond will fund eight significant public lands projects, including the Folsom Trail and Allen Park.
Freshly paved Folsom Trail is a nice start, but the city aims to resurface City Creek, create gathering spaces and connect it to the Jordan River Parkway.
Share your visual preference for City Creek at Folsom Trail: https://folsomtrail.org/survey. Feedback will guide the creation of two design concepts for the City Creek channel and additional improvements.
The Salt Lake City Parks, Trails, and Open Space Bond will be on the ballot for Salt Lake City residents this November for the midterm elections. The $85-million bond would fund eight significant public lands projects, including the Folsom Trail and Allen Park.
The survey for City Creek at Folsom Trail is live and available in both Spanish and English until October 1st. Share your improvement preference and concerns at: https://folsomtrail.org/survey.
The Folsom Trail opened to the public on June 8, 2022! Next steps include the daylighting of City Creek through the corridor.
CRSA, BIO-WEST, and Avenue Consultants, in partnership with the Seven Canyons Trust and Salt Lake City Redevelopment Agency, will lead the Folsom Corridor City Creek Daylighting Design Master Plan. This process will set in motion a community-supported vision to daylight City Creek through the Folsom Corridor.
The Redevelopment Agency of Salt Lake City is soliciting proposals to advance the daylighting of City Creek through the Folsom Corridor. The consultant will assist with technical analysis, community engagement, and design services.
Construction on the Folsom Trail began on June 1st, and is expected to finish by the end of the year. This project is the first phase in revitalizing the Folsom Corridor.
Construction of the Folsom Trail is expected in Spring 2021 and completion by 2022. Feasibility of daylighting City Creek, adjacent to the trail, was studied and two design concepts presented. Additional study is needed to move forward.
Survey results for the Folsom Trail in Salt Lake City, UT on lighting and landscaping design preferences. Users want adequate lighting, places to sit, native plants, and decorative gravel elements.
An article telling the recent history of the Folsom Trail and daylighting of City Creek in Salt Lake City, UT. It details the narrative of the stream and it ties to the Poplar Grove community.
A report studying the feasibility of uncovering City Creek through the Folsom Corridor in Salt Lake City, UT. It explores two concepts—a partial-flow channel and a full-flow channel.
Salt Lake City is looking for a consultant to study the feasibility of daylighting City Creek through the Folsom Corridor. Apply now!
A proposed brewery, Grid City Beer Works, could be coming to the Folsom Corridor. The business is a precedent for the intersection between private development and the corridor.
A report on community engagement in the Folsom Trail and daylighting of City Creek with University of Utah Westside Studio students in Salt Lake City, UT.
Sources
Salt Lake Tribune, Realigning a downtown rail line could turn a neighborhood into a no-horn haven (2006).
Environmental Protection Agency, Fourth Five-Year Report for Utah Power & Light-American Barrel Superfund Site in Salt Lake City, Utah (2016).
Downtown Planning Association, Inc., Official Report Downtown Salt Lake City Second Century Plan (1962).
Salt Lake City, Salt Lake City Open Space Plan (1992).
URS Corporation, Euclid Small Area Master Plan (2006).
J-U-B Engineers, Folsom Avenue Storm Drain Project (2011).
Westside Studio, North Temple Westside Studio Survey Results (2016).